Dockets
GPA DOCKET NO. 26-02: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE PHASE IV RENEWABLE ENERGY ACQUISITION AWARD TO PRG CTI TANGUISSON LLC FOR UP TO 60 MW OF RENEWABLE ENERGY CAPACITY
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-10-10 | |
| NOTICE OF ERRATA | 2025-10-16 | |
| LEGAL COUNSEL REPORT | 2025-10-24 | |
| ORDER | 2025-10-30 |
GPA DOCKET NO. 26-01: PETITION FOR APPROVAL AND AUTHORIZATION FOR GPA TO RENEW PROPERTY INSURANCE
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-10-01 | |
| LEGAL COUNSEL REPORT | 2025-10-30 | |
| ORDER | 2025-10-30 |
GPA DOCKET NO. 25-21: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE CONSTRUCTION CHANGE ORDER TO PERFORM LEAD ABATEMENT AND ADDITIONAL REPAIRS ON TANK 1934.
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-09-05 |
GPA Docket No. 25-20: PETITION TO APPROVE THE GUAM POWER AUTHORITY'S REVENUE FUNDED CAPTIAL IMPROVEMENT PROJECT CEILING CAP FOR FY2026
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-09-08 | |
| ALJ REPORT | 2025-09-16 | |
| ORDER | 2025-09-25 |
GPA Docket No. 25-19: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE 5-MONTH EXTENSION OF PERFORMANCE MANAGEMENT CONTRACT FOR COMBUSTION TURBINE PLANTS TO JULY 31, 2026.
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-09-05 | |
| ALJ REPORT | 2025-09-12 | |
| ORDER | 2025-09-25 |
GPA Docket No. 25-18: PETITION OF THE GUAM POWER AUTHORITY TO AWARD CONTRACT FOR COMPREHENSIVE UNARMED UNIFORMED SECURITY GUARD SERVICES
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-09-05 | |
| REQUEST FOR INFORMATION | 2025-09-16 | |
| GPA'S RESPONSE TO RFI | 2025-09-17 | |
| ALJ REPORT | 2025-09-22 | |
| ORDER | 2025-09-25 |
GPA Docket No. 25-17: PETITION OF GUAM POWER AUTHORITY TO APPROVE THE EXTENSION OF CABRAS 1 and 2 PERFORMANCE MANAGEMENT CONTRACT UNTIL JANUARY 31, 2026
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-08-08 | |
| LEGAL COUNSEL REPORT | 2025-08-22 | |
| ORDER | 2025-08-28 |
GPA Docket No. 25-16: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE PHASE IV RENEWABLE ENERGY ACQUISITION REWARD PRU TAMUNING LLC, PRU MALOJLOJ LLC, PULANTANT LLC, AND PRU BARRIGADA LLC FOR UP TO 18.4MW RENEWABLE ENERGY CAPACITY
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-08-07 | |
| LEGAL COUNSEL REPORT | 2025-08-22 | |
| ORDER | 2025-08-28 |
GPA Docket No. 25-15: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE ITS PROCUREMENT OF ENERGY STORAGE SYSTEM ENERGY-SHIFTING AND GRID SERVICES
GPA Docket No. 25-14: PETITION OF THE GUAM POWER AUTHORITY TO ADJUST BASE RATE
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-06-06 | |
| AMENDED PETITION | 2025-08-08 |
GPA Docket No. 25-13: PETITION OF THE GUAM POWER AUTHORITY FOR TWO STEP REDUCTION IN THE LEVELIZED ENERGY ADJUSTMENT CLAUSE (LEAC) FOR THE PERIOD OF AUGUST 01, 2025 THROUGH JANUARY 21, 2026
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-06-04 | |
| MCG REPORT | 2025-06-17 | |
| ALJ REPORT | 2025-06-21 | |
| ORDER | 2025-06-26 |
GPA Docket No. 25-12: PETITION OF THE GUAM POWER AUTHORITY TO AMEND THE UKUDU POWER PLANT ENERGY CONVERSION AGREEMENT TO PERMIT GPA TO PAY FOR ADDITIONAL TESTING
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-05-09 | |
| NOTICE OF ERRATA | 2025-05-13 | |
| ALJ REPORT | 2025-05-22 | |
| SUPPLEMENT TO PETITION | 2025-05-28 | |
| AMENDED SUPPLEMENT TO PETITION | 2025-05-29 | |
| ORDER | 2025-05-29 |
GPA Docket No. 25-11: PETITION OF THE GUAM POWER AUTHORITY TO ENTER INTO AN AGREEMENT WITH TRISTAR TERMINAL GUAM, INC. TO EXTEND THE TERM FOR (A) RFO PIPELINE AND (B) RFO STORAGE LEASE AGREEMENT
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-05-01 | |
| REQUEST FOR INFORMATION (RFI) | 2025-05-16 | |
| GPA'S RESPONSE TO RFI | 2025-05-21 | |
| ALJ REPORT | 2025-05-27 | |
| ORDER | 2025-05-29 |
GPA Docket No. 25-10: PETITION OF THE GUAM POWER AUTHORITY TO ENTER A MONTH-TO-MONTH EXTENSION FOR ITS PROFESSIONAL PRINTING, MAILING, PROCESSING AND OTHER SERVICES DUE TO ONGOING LITIGATION
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-04-04 | |
| LEGAL COUNSEL REPORT | 2025-04-17 | |
| ORDER | 2025-04-24 |
GPA Docket No. 25-09: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE PROCUREMENT OF COMPREHENSIVE UNARMED UNIFORMED SECURITY GUARD SERVICES
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-03-08 | |
| REQUEST FOR INFORMATION (RFI) | 2025-03-14 | |
| GPA'S RESPONSE TO RFI | 2025-03-20 | |
| ALJ REPORT | 2025-03-24 | |
| ORDER | 2025-03-27 |
GPA Docket No. 25-08: PETITION OF THE GUAM POWER FOR APPROVAL OF ADDITIONAL PROJECTED COSTS OF UREA SUPPLY CONTRACT
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-02-12 | |
| REQUEST FOR INFORMATION (RFI) | 2025-02-13 | |
| GPA'S REPONSE TO RFI | 2025-02-14 | |
| ALJ REPORT | 2025-02-27 | |
| ORDER | 2025-02-27 |
GPA Docket No. 25-07: PETITION OF THE GUAM POWER AUTHORITY FOR AUTHORIZATION TO PROCURE STRATEGIC PROGRAM MANAGEMENT OFFICE FOR GPA'S FURTURE PROJECTS
GPA Docket No. 25-06: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE THE SOLICITATION OF A PERFOMANCE MANAGEMENT CONTRACT FOR GPA’s COMBUSTION TURBINE POWER PLANTS
| Title | Date | Download |
|---|---|---|
| PETITION | 2025-01-07 | |
| ALJ REPORT | 2025-01-30 | |
| ORDER | 2025-01-30 |
GPA Docket No. 25-05: PETITION OF THE GUAM POWER AUTHORITY CLAUSE (LEAC) REDUCE THE LEVELIZED ENERGY ADJUSTMENT FOR FEBRUARY 1, 2025 THROUGH JULY 31, 2025
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-12-13 | |
| ALJ REPORT | 2025-01-30 | |
| MCG REPORT | 2025-01-23 | |
| ORDER | 2025-01-30 | |
| THE GUAM POWER AUTHORITY'S SUBMISSION OF ITS LEAC UPDATE REPORT FOR APRIL 30, 2025 | 2025-06-02 |
GPA Docket No. 25-04: PETITION FOR APPROVAL AND AUTHORIZATION FOR GPA TO RENEW PROPERTY INSURANCE
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-11-18 | |
| SUPPLEMENT to PETITION | 2024-11-27 | |
| LEGAL COUNSEL REPORT | 2024-11-25 | |
| ORDER | 2024-12-02 |
GPA Docket No. 25-03: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE AWARD OF CONTRACTS TO SUPPLY ULTRA-LOW SULFUR DIESEL (ULSD) TO VARIOUS POWER GENERATING PLANT SITE LOCATIONS
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-10-04 | |
| SUPPLEMENT TO PETITION | 2024-10-28 | |
| ALJ REPORT | 2024-11-01 | |
| ORDER | 2024-11-05 |
GPA Docket No. 25-02: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE PROCUREMENT OF SERVICES TO DESIGN AND BUILD INFRASTRUCTURE FOR AND SERVICES TO INSTALL, TEST, AND COMMISSION PITI SUBSTATION T-7 POWER TRANSFORMER AS PART OF REPLACEMENT PROJECT
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-10-04 | |
| ALJ REPORT | 2024-10-28 | |
| ORDER | 2024-11-05 |
GPA Docket No. 25-01: PETITION OF THE GUAM POWER AUTHORITY TO APPROVE THE PURCHASE OF WATER SYSTEM DIESEL GENERATORS
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-10-04 | |
| ALJ REPORT | 2024-12-02 | |
| ORDER | 2024-12-02 |
GPA Docket No. 24-27: Approval of the Repair and Overhaul of the Navy-Owned Orote Power Plant
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-09-09 | |
| ALJ REPORT | 2024-09-26 | |
| ORDER | 2024-09-27 |
GPA Docket No. 24-26: Petition to Approve GPA's Revenue-Funded Capital Improvement Project Ceiling Cap for FY2025
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-09-13 | |
| SUPPLEMENT TO PETITION | 2024-10-25 | |
| LEGAL COUNSEL | 2024-10-30 | |
| ORDER | 2024-11-05 |
GPA Docket No 24-25: Petition to Approve Phase IV Renewable Energy Acquisition Award to Kepco-Ewp-Samsung C&T Consortium and Core Tech Solar Energy LLC, up to 192 mw of Renewable Energy Capacity
GPA Docket No 24-24: Petition of the Guam Power Authority to Approve the Purchase of the Water System Diesel (WSD) Generators
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-09-09 | |
| ALJ REPORT | 2024-12-02 | |
| ORDER | 2024-12-02 |
GPA Docket No. 24-23 : Petition of Guam Power Authority to Approve the Bond Financing Savings Utilization
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-09-09 | |
| ALJ REPORT | 2024-09-19 | |
| ORDER | 2024-09-26 |
GPA Docket No. 24-22: Petition to Approve the Construction of the New Transmission & Distribution Facility
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-08-09 | |
| REQUEST FOR INFORMATION (RFI) | 2024-08-29 | |
| GPA'S RESPONSE TO (RFI) | 2024-09-11 | |
| ALJ REPORT | 2024-11-04 | |
| ORDER | 2024-11-05 |
GPA Docket No. 24-21: Petition to Approve the Contract with TEMES, INC. to Overhaul Piti 7
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-08-07 | |
| ALJ REPORT | 2024-08-29 | |
| ORDER | 2024-08-29 |
GPA Docket No. 24-20: Petition to Maintain the Levelized Energy Adjustment Clause (LEAC) for the Period of August 1, 2024 through January 31, 2025
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-06-07 | |
| SUBMISSION | 2024-06-14 | |
| CONSTULTANT REPORT | 2024-07-21 | |
| ALJ REPORT | 2024-07-21 | |
| ORDER | 2024-07-25 |
GPA Docket No. 24-19: Petition of the Guam Power Authority to Approve a Bond Issuance to Refinance a Portion of the Outstanding 2014 Series A Bonds
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-05-15 | |
| ALJ REPORT | 2024-05-23 | |
| AMENDED PETITION | 2024-05-30 | |
| ORDER | 2024-05-30 | |
| ORDER APPROVING LONG-TERM DEBT | 2024-05-30 | |
| NOTICE OF SUBMISSION | 2024-05-31 |
GPA Docket No. 24-18: Joint Petition to Authorize GPA and GWA to Award Merchant Banking Services Contract
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-05-07 | |
| COUNSEL REPORT | 2024-05-23 | |
| AMENDED PETITION | 2024-05-29 | |
| ORDER | 2024-05-30 |
GPA Docket No. 24-17: Petition of the Guam Power Authority to Enter into a Month-to-Month Extension for its Professional Printing, Mailing, Processing and Other Services Due to Ongoing Litigation
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-05-06 | |
| COUNSEL REPORT | 2024-05-23 | |
| ORDER | 2024-05-30 |
GPA Docket no. 24-16: Petition to Approve the Energy Conversion Agreement (ECA) Amendment for the Ukudu Power Plant
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-04-09 | |
| ALJ REPORT | 2024-07-23 | |
| ORDER | 2024-07-25 |
GPA Docket No. 24-15: Petition of the Guam Power Authority to Approve the Award of 20MW of Temporary Power
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-02-15 | |
| AMENDED PETITION | 2024-02-23 | |
| SECOND AMENDED PETITION | 2024-03-13 | |
| ALJ REPORT | 2024-03-25 | |
| ORDER | 2024-03-28 |
GPA Docket No. 24-14: Petition of the Guam Power Authority to Approve Procurement of Supply of Ultra Low Sulfur Diesel (ULSD) for the Various Power Generating Plant Site Locations
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-02-14 | |
| ALJ REPORT | 2024-02-26 | |
| ORDER | 2024-02-29 |
GPA Docket No. 24-13: Petition of the Guam Power Authority to Approve the Extension of the Ultra-Low Sulfur Diesel (ULSD) Storage Lease Agreement with Tristar Terminals Guam, Inc.
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-02-14 | |
| ALJ REPORT | 2024-02-26 | |
| ORDER | 2024-02-29 |
GPA Docket No. 24-12: Petition of the Guam Power Authority to Approve the Two (2) Consecutive Year Extension of the Residual Fuel Oil (RFO) No. 6 Supply Contract with Hyundai Corporation
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-02-14 | |
| ALJ REPORT | 2024-02-27 | |
| ORDER | 2024-02-29 |
GPA Docket No. 24-11: Petition of the Guam Power Authority to Approve the Relocation of the Yigo Diesel Generators
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-02-14 | |
| LEGAL COUNSEL REPORT | 2024-02-26 | |
| ORDER | 2024-02-29 |
GPA Docket no. 24-10: Petition to Approve Purchase of Water System Diesel Generators
| Title | Date | Download |
|---|---|---|
| PETITION | 2024-01-10 | |
| LEGAL COUNSEL REPORT | 2024-01-19 | |
| ORDER | 2024-01-25 |
GPA Docket no. 24-09: Petition to Approve Increase in Contract Expenditures for Water System Diesel Generator Fuel
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-12-06 | |
| LEGAL COUNSEL REPORT | 2023-12-17 | |
| ORDER | 2023-12-19 |
GPA Docket no. 24-08: Petition to Approve an Adjusted LEAC factor and Notice of Attached LEAC Filing
GPA Docket no. 24-07: Petition to Approve 40 Megawatts (MW) Temporary Power Procurement
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-11-14 | |
| LEGAL COUNSEL REPORT | 2023-11-16 | |
| ORDER | 2023-11-30 |
GPA Docket no. 24-06: Petition to Approve Amendment 2 to Hanwan Energy Corporation’s Phase II, Renewable Energy Acquisition Power Purchase Agreement
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-11-16 | |
| ALJ REPORT | 2023-11-22 | |
| SUPPLEMENTAL ALJ REPORT | 2024-01-17 | |
| ORDER | 2024-01-25 | |
| Notice of Termination | 2025-03-21 | |
GPA Docket no. 24-05: Petition for Approval to Award Hyundai Corporation GPA’s Contract for Bulk Supply Ultra Low Sulfur Diesel (ULSD) Fuel Oil
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-11-14 | |
| ALJ REPORT | ||
| ORDER | 2023-11-30 |
GPA Docket no. 24-04: Petition for Approval to Authorize GPA to Exercise Its Option to Renew Unarmed Security Guard Services
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-11-14 | |
| ALJ REPORT | 2023-11-29 | |
| ORDER | 2023-11-30 |
GPA Docket no. 24-03: Petition to Review 12 GCA §8502(c)(2)(B) relative to Net Metering
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-11-14 |
GPA Docket No. 24-02: Petition for Approval and Authorization for GPA to Award Casualty Insurance
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-10-24 | |
| ALJ REPORT | 2023-10-25 | |
| ORDER | 2023-10-26 | |
| GPA'S REPORT RE SELF INSURANCE FOR PROFESSIONAL LIABILITY INSURANCE | 2024-11-26 | |
GPA Docket no. 24-01: Petition for Approval and Authorization for GPA to Award Property Insurance
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-10-26 | |
| ALJ REPORT | 2023-10-30 | |
| ORDER | 2023-10-31 |
GPA Docket no. 23-22: Petition to Approve GPA's FY 2024 Internally Funded CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-09-23 | |
| ALJ REPORT | 2023-09-25 | |
| ORDER | 2023-09-28 |
GPA Docket No. 23-21: Petition to Approve the Purchase of Bucket Trucks
GPA Docket No. 23-20: Petition to Procure a Hot Section Exchange & Generator Repair for Yigo CT
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-08-11 | |
| ALJ REPORT | 2023-08-21 | |
| ORDER | 2023-09-28 |
GPA Docket No. 23-19: Petition to Extend the Performance Management Contract for Cabras 1 and 2
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2023-08-04 | |
| PETITION | 2023-08-04 | |
| ORDER | 2023-09-26 |
GPA Docket No. 23-18: Petition to Authorize GPA and GWA to Procure Merchant Banking Services
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-05-29 | |
| COUNSEL REPORT | 2023-06-02 | |
| ORDER | 2023-06-05 |
GPA Docket No. 23-17: Petition to Approve the EPCM, Phase 1, Liquified Natural Gas (LNG) Pre-Development Study, Scope, and Costs
GPA Docket No. 23-16: Petition to Approve a Reduced LEAC Factor
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-05-03 | |
| ALJ REPORT | 2023-05-17 | |
| ORDER | 2023-05-28 | |
| RATIFICATION ORDER | 2023-06-05 |
GPA Docket No. 23-15: Petition for Approval to Increase the Amount of Award for GPA's Physical Security Proof of Concept
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-08-31 | |
| ALJ REPORT | 2023-08-28 | |
| PETITION | 2023-07-24 |
GPA Docket No. 23-14: Petition for Contract Review and Approval for GPA’s Fuel Bulk Storage Facility
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-04-27 | |
| ALJ REPORT | 2023-04-24 | |
| EXHIBIT B | 2023-04-21 | |
| EXHIBIT A | 2023-04-21 | |
| PETITION | 2023-04-21 |
GPA Docket No. 23-13: Petition to Approve the Month-Month Extension for Professional Printing, Mailing, and Processing Services
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-03-08 | |
| COUNSEL REPORT | 2023-03-27 | |
| ORDER | 2023-03-30 |
GPA Docket No. 23-12: Petition for Review and Approval of GPA’s Request for Procurement of the Bulk Supply of Diesel Fuel Oil
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-02-28 | |
| ALJ REPORT | 2023-03-27 | |
| ORDER | 2023-03-30 |
GPA Docket No. 23-11: Petition for Review and Approval of the Piti 8 & 9 Contract Extension with Marianas Energy Company
| Title | Date | Download |
|---|---|---|
| PETITION | 2023-02-28 | |
| ALJ REPORT | 2023-03-13 | |
| ORDER | 2023-03-30 |
GPA Docket No. 23-10: Petition for Contract Review, Request for Approval of the Procurement of Property Insurance including Boiler and Machinery Coverage and Terrorism Coverage
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-02-23 | |
| LEGAL COUNSEL REPORT | ||
| PETITION | 2023-02-10 |
GPA Docket No. 23-09: GPA's Request for Approval to Adjust the Power Pole Attachment Rate
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-08-31 | |
| ALJ REPORT | 2023-08-24 | |
| PETITION | 2023-02-16 |
GPA Docket no. 23-08: Application of GPA Requesting Approval of the Revision of the GPA Line Extension Policy
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-04-27 | |
| ALJ REPORT | 2023-04-18 | |
| PETITION | 2023-02-16 |
GPA Docket No. 23-07: Petition for Contract Review for the Cancellation of the Cabras 41MW Reserve Facility and Modification of the Energy Conversion Agreement
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-02-23 | |
| ALJ REPORT | 2023-02-20 | |
| PETITION | 2023-02-13 |
GPA Docket No 23-06: Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| ORDER | 2023-01-26 | |
| ALJ REPORT | 2023-01-19 | |
| SUPPLEMENTAL LEAC UPDATE | 2023-01-17 | |
| LEAC FILING | 2022-12-07 |
GPA Docket No. 23-05: Petition for Approval of Extension of the ULSD Tank Lease Agreement with TriStar
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-12-19 | |
| ALJ REPORT | 2022-12-16 | |
| PETITION | 2022-12-07 |
GPA Docket No. 23-04: Filing of Approved Contracts and Obligations for FY2022
| Title | Date | Download |
|---|---|---|
| REPORT | 2022-12-01 |
GPA Docket No. 23-03: Petition for Approval of Property insurance Contract Extension with DB Insurance Co. Ltd.
| Title | Date | Download |
|---|---|---|
| PETITION | 2022-11-04 | |
| PUC COUNSEL REPORT | 2022-11-23 | |
| ORDER | 2022-11-29 |
GPA Docket No. 23-02: Petition for Approval of Engineering, Procurement and Construction Management (EPCM) Contract with Stanley Consultants, Inc.
| Title | Date | Download |
|---|---|---|
| PETITION | 2022-11-04 | |
| ALJ REPORT | 2022-11-23 | |
| ORDER | 2022-11-29 |
GPA Docket No. 23-01: Petition for Approval of the Phase IV Renewable Acquisition for GPA
| Title | Date | Download |
|---|---|---|
| PETITION | 2022-10-14 | |
| ALJ REPORT | 2022-10-18 | |
| ORDER | 2022-10-27 |
GPA Docket No. 22-20: Petition to Approve Bond Refinancing Savings for Capital Lease and O&M Expense of the Ukudu Power Project
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-09-29 | |
| ALJ REPORT | 2022-09-10 | |
| PETITION | 2022-09-06 |
GPA Docket No. 22-19: Petition to Approve Contract with TEMES for Macheche CT Repairs
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-09-29 | |
| ALJ REPORT | 2022-09-17 | |
| PETITION | 2022-09-06 |
GPA Docket No. 22-18: Petition to Extend the Contract for the Management, Operation, and Maintenance of GPA's Fuel Storage Facility with ISLA Petroleum & Energy
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-09-29 | |
| ALJ REPORT | 2022-08-22 | |
| PETITION | 2022-08-04 |
GPA Docket 22-17: Petition for Extension of Dock Facility Agreement with Tristar Terminals
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-09-29 | |
| ALJ REPORT | 2022-09-26 | |
| PETITION | 2022-08-04 |
GPA Docket No. 22-16: Petition for Extension of the Term of the Lease Agreements for Pipeline and RFO Storage with Tristar Terminals
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-09-29 | |
| ALJ REPORT | 2022-09-26 | |
| PETITION | 2022-08-04 |
GPA Docket No. 22-15 In the Matter of: Guam Power Authority Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| ORDER - October 27, 2022 | 2022-10-27 | |
| ALJ REPORT - October 24, 2022 | 2022-10-24 | |
| ORDER - June 16, 2022 | 2022-06-16 | |
| ALJ REPORT - June 16, 2022 | 2022-06-16 | |
| GPA LEAC FILING | 2022-06-01 |
GPA Docket No. 22-14 In the Matter of: The Application of the Guam Power Authority to Approve the Month-to-Month Extension for Professional Printing, Mailing, and Processing Services
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-05-26 | |
| PUC COUNSEL REPORT | 2022-05-23 | |
| GPA PETITION | 2022-05-02 |
GPA Docket No. 22-13 In the Matter of: The Application of the Guam Power Authority to Approve the Amendment to the Contract for Residual Fuel Oil No.6 for the Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-05-26 | |
| ALJ REPORT | 2022-05-26 | |
| GPA PETITION | 2022-05-10 |
GPA Docket No. 22-12 In the Matter of: The Guam Power Authority Filing of the Increase in the FY2022 Residual Fuel Oil (RFO) and Diesel Fuel Oil (DFO) Budget
| Title | Date | Download |
|---|---|---|
| GPA PETITION | 2022-05-02 |
GPA Docket No. 22-11 In the Matter of: The Application of the Guam Power Authority Requesting Approval of the Contract Amendment for Bulk Storage Fuel Tanks Inspection and Refurbishment
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-05-26 | |
| ALJ REPORT | 2022-05-23 | |
| GPA PETITION | 2022-05-03 |
GPA Docket No. 22-10 In the Matter of: The Application of the Guam Power Authority to Approve A Bond Issuance to Refinance a Portion of the Outstanding Revenue Bonds
| Title | Date | Download |
|---|---|---|
| ORDER APPROVING LONG-TERM DEBT | 2022-03-31 | |
| ORDER | 2022-03-31 | |
| ALJ REPORT | 2022-03-31 | |
| GPA PETITION | 2022-03-18 |
GPA Docket No. 22-09 In the Matter of: The Application of the Guam Power Authority to Approve the Contract for Merchant Services for GPA and GWA
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-03-31 | |
| ALJ REPORT | 2022-03-31 | |
| GPA PETITION | 2022-03-09 |
GPA Docket No. 22-08 In the Matter of: The Guam Power Authority 2022 Integrated Resource Plan (IRP)
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-05-26 | |
| ALJ REPORT | 2022-05-26 | |
| GPA FILING | 2022-01-31 |
GPA Docket No. 22-07 In the Matter of: The Application of the Guam Power Authority for Approving the Contract with TEMES, Inc. for the Cabras 2 Overhaul
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-03-31 | |
| PUC COUNSEL REPORT | 2022-03-28 | |
| GPA PETITION | 2022-01-27 |
GPA Docket No. 22-06 In the Matter of: The Application of the Guam Power Authority for Approval of the Utility Services Contract (USC) with US Navy
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-02-24 | |
| ALJ REPORT | 2022-02-24 | |
| GPA PETITION | 2022-01-27 |
GPA Docket No. 22-05 In the Matter of: Guam Power Authority Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| ORDER | 2022-03-31 | |
| ALJ REPORT | 2022-03-31 | |
| ORDER | 2022-01-27 | |
| ALJ REPORT | 2022-01-27 | |
| LEAC FILING | 2021-12-02 |
GPA Docket No. 22-04 The Application of the Guam Power Authority for Approving the Contract for Supply of Diesel Fuel Oil to GPA
| Title | Date | Download |
|---|---|---|
| ORDER OF RATIFICATION | 2022-01-27 | |
| ORDER | 2022-01-27 | |
| ALJ REPORT | 2022-12-15 | |
| GPA PETITION | 2021-12-02 |
GPA Docket No. 22-03 Guam Power Authority's Filing of FY2021 Approved Contracts and Obligations
| Title | Date | Download |
|---|---|---|
| GPA FY2021 Filing | 2021-11-23 |
GPA Docket No. 22-02 The Application of the GPA Requesting Approval of the Procurement of a Performance Management Contract (PMC) for the Management Operation and Maintenance of the GPA Fuel Farm Bulk Storage Facility
| Title | Date | Download |
|---|---|---|
| ORDER | 2021-12-02 | |
| ALJ REPORT | 2021-12-02 | |
| GPA PETITION | 2021-11-08 |
GPA Docket No. 22-01 In the Matter of: The Petition of the GPA for approval of Property Insurance Contract Extension with DB Insurance Co., Ltd.
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-10-28 | |
| PUC COUNSEL REPORT | 2021-10-25 | |
| GPA PETITION | 2021-10-11 |
GPA Docket 21-19 In the Matter of: The Guam Power Authority Filing of the FY 2022-2024 Construction Budget
| Title | Date | Download |
|---|---|---|
| GPA FILING | 2021-09-10 |
GPA Docket 21-18 In the Matter of: The Guam Power Authority to Approve the FY2022 GPA CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-09-30 | |
| ALJ REPORT | 2021-09-30 | |
| GPA PETITION | 2021-09-10 |
GPA Docket 21-17 In the Matter of: The Application of the Guam Power Authority to Approve the Amendment to the Contract for Residual Fuel Oil No.6 for the Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-08-26 | |
| ALJ REPORT | 2021-08-23 | |
| GPA PETITION | 2021-08-10 |
GPA Docket 21-16 In the Matter of: The Application of the GPA to Approve the Contract w/Tristar Terminals Guam, Inc., for the Lease of an Additional Storage Tank for Diesel Fuel
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-09-30 | |
| COUNSEL REPORT | 2021-09-27 | |
| GPA PETITION | 2021-08-10 |
GPA Docket 21-15 In the Matter of: The Application of the GPA to Approve a Bond Issuance to Refinance a Portion of the Outstanding Revenue Bonds
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-07-29 | |
| ALJ REPORT | 2021-07-29 | |
| GPA PETITION | 2021-06-11 |
GPA Docket 21-14 In the Matter of: GPA Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-07-29 | |
| ALJ REPORT | 2021-07-29 | |
| LEAC PETITION | 2021-06-10 |
GPA Docket 21-13 In Re: Petition Requesting Approval of the Procurement of Engineering Services by GPA
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-07-29 | |
| ALJ REPORT | 2021-07-26 | |
| GPA PETITION | 2021-06-10 |
GPA Docket 21-12 In the Matter of: The Application of the GPA for Approving the Contract with TEMES, Inc. for Yigo CT Repairs
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-05-27 | |
| ALJ REPORT | 2021-05-27 | |
| GPA PETITION | 2021-05-21 |
GPA Docket 21-11 The Application of the GPA to Approve the Contract Extension for Professional Printing, Mailing, Processing, and Other Services
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-07-29 | |
| PUC COUNSEL REPORT | 2021-06-21 | |
| GPA PETITION | 2021-05-21 |
GPA Docket 21-10 In the Matter of: The Application of the Guam Power Authority for Approving the Procurement for Supply of Diesel Fuel Oil to GPA
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-05-27 | |
| ALJ REPORT | 2021-05-27 | |
| GPA PETITION | 2021-05-03 |
GPA Docket 21-09 The Application of the GPA to Exercise Extension Option under the Diesel Fuel Supply Contract w/Mobil Guam, Inc. and Isla Petroleum and Energy, LLC ("IP&E Guam")
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-04-29 | |
| ALJ REPORT | 2021-04-24 | |
| GPA PETITION | 2021-04-07 |
GPA Docket 21-08 Application of the GPA to Approve the Procurement of Merchant Services
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-04-29 | |
| ALJ REPORT | 2021-04-16 | |
| GPA PETITION | 2021-04-05 |
GPA Docket 21-07 Petition to Approve Amendment to the Energy Conversion Agreement [ECA] with KEPCO for the 198 MW Power Plant
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-02-25 | |
| ALJ REPORT | 2021-02-22 | |
| REQUEST FOR INFORMATION | 2021-02-11 | |
| GPA PETITION | 2021-02-05 |
GPA Docket 21-06 Petition to Approve the Piti 8&9 Contract for Conversion to ULSD with Marianas Energy Company
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-02-25 | |
| ALJ REPORT | 2021-02-22 | |
| REQUEST FOR INFORMATION | 2021-02-10 | |
| GPA PETITION | 2021-02-05 |
GPA Docket 21-05 Filing of FY20 Contracts and Obligations
| Title | Date | Download |
|---|---|---|
| GPA FILING | 2020-12-04 |
GPA Docket 21-04 Levelized Energy Adjustment Clause [LEAC] Filing for Period February - July 2021
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2021-01-28 | |
| ALJ REPORT | 2021-01-28 | |
| GPA PETITION | 2020-12-04 |
GPA Docket 21-03 Application of the Guam Power Authority to Approve the Contract Extension for Performance Management Contract (PMC) for Combustion Turbine Power Plant
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-11-30 | |
| ALJ REPORT | 2020-11-25 | |
| GPA PETITION | 2020-11-13 |
GPA Docket 21-02 Petition to Approve Security Guard Service Contract Option
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-10-29 | |
| ALJ REPORT | 2020-10-26 | |
| GPA PETITION | 2020-10-20 |
GPA Docket 21-01 Petition to Approve Increase in Engineering, Procurement and Construction Management [EPCM] Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-10-29 | |
| ALJ REPORT | 2020-10-26 | |
| GPA PETITION | 2020-10-20 |
GPA Docket 20-20 Filing of the FY2021-2023 Construction Budget
| Title | Date | Download |
|---|---|---|
| GPA FILING | 2020-09-15 |
GPA Docket 20-19 Petition to Approve FY2021 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-09-24 | |
| ALJ REPORT | 2020-09-18 |
GPA Docket 20-18 Application to Approve a One-Month Extension to the Contract for Residual Fuel Oil No. 6 for the Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-09-24 | |
| CHAIRMAN'S ORDER | 2020-08-28 | |
| ALJ REPORT | 2020-08-07 |
GPA Docket 20-17 Application to Approve the Contract for Residual Fuel Oil No. 6 for the Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-07-30 | |
| PUC COUNSEL REPORT | 2020-07-27 |
GPA Docket 20-16 Application to Retire Piti 8 & 9 Units and to Procure 60MW of Renewable Energy
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-09-24 | |
| ALJ REPORT | 2020-09-17 |
GPA Docket 20-15 Application to Approve the Contract for a PMC for Cabras 1 and 2 Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-07-30 | |
| ALJ REPORT | 2020-07-17 |
GPA Docket 20-14 Application of the Guam Power Authority to Approve the Procurement of a PMC for the Management, Operation and Maintenance of the 40MW Aggreko Power Plant
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-06-25 | |
| PUC COUNSEL REPORT | 2020-06-22 |
GPA Docket 20-13 GPA Docket 20-13 Petition to set the LEAC Factor effective August 1, 2020
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-07-30 | |
| ALJ REPORT | 2020-07-27 |
GPA Docket 20-12 Interim LEAC Filing
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-05-28 | |
| ALJ REPORT | 2020-05-26 | |
| ALJ REPORT | 2020-03-26 | |
| PUC ORDER | 2020-03-26 |
GPA Docket 20-11 Petition to Approve the Procurement of Residual Fuel Oil No. 6 for the Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-03-26 | |
| PUC COUNSEL REPORT | 2020-03-16 |
GPA Docket 20-10 Petition for Creation of Condominium Rate Schedule
GPA Docket 20-09 Petition for Creation of New Energy Storage Rate
GPA Docket 20-08 Application of GPA to Exercise Extension Option under the Management, Operation, and Maintenance of GPA's Fuel Bulk Storage Facility Contract with Isla Petroleum and Energy, LLC (IP&E Guam )
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-02-27 | |
| PUC COUNSEL REPORT | 2020-02-23 |
GPA Docket 20-07 Application of GPA for Approving the Procurement for Supply of Diesel Fuel Oil to the Guam Power Authority
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-02-27 | |
| PUC COUNSEL REPORT | 2020-02-23 |
GPA Docket 20-06 Petition to Amend Guam Power Authority's Net Metering Rider
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-05-28 | |
| ALJ REPORT | 2020-05-23 |
GPA Docket 20-05 Demand Side Management (DMS)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-05-28 | |
| ALJ REPORT | 2020-05-22 |
GPA Docket 20-04 The Application fo the Guam Power Authority to Approve the Procurement of a PMC for Cabras 1 and 2 Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-01-30 | |
| PUC COUNSEL REPORT | 2020-01-13 |
GPA Docket 20-03 Guam Power Authority Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-01-30 | |
| PUC ALJ REPORT | 2020-01-06 |
GPA Docket 20-02 GPA’s Filing of FY2019 Approved Contracts and Obligations
GPA Docket 20-01 The Application of the Guam Power Authority to Approve the Consent Decree with the United States Environmental Protection Agency (EPA)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-12-05 | |
| ALJ REPORT | 2019-12-02 | |
| EXHIBIT 2 OF THE ALJ REPORT | 2019-12-02 |
GPA Docket 19-15 Filing of FY2020 Construction Budget
GPA Docket 19-14 Petition to Approve the FY2010 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-09-26 | |
| ALJ REPORT | 2019-09-16 |
GPA Docket 19-13 Petition for Contract Review to Approve the Energy Conversion Agreement (ECA) with KEPCO for the 198MW New Power Plant
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-10-31 | |
| ALJ REPORT | 2019-10-28 |
GPA Docket 19-12 Petition for Award of Contract for the Supply of Diesel Fuel Oil No. 2 for the Baseload Power Plants and Peaking Units
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-08-29 | |
| ALJ REPORT | 2019-08-25 |
GPA Docket 19-11 LEAC Filing
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-07-25 | |
| PUC ALJ REPORT | 2019-07-18 | |
| GPA PETITION | 2019-06-12 |
GPA Docket 19-10 Petition for Approval of Utility Energy Service Costs
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2020-07-22 | |
| PUC COUNSEL REPORT | 2019-07-22 |
GPA Docket 19-09 Petition of GAR/Legislators for Multi Family Accomodation Rates
| Title | Date | Download |
|---|---|---|
| ALJ ORDER FOR SCHEDULING CONFERENCE | 2019-05-01 | |
| AUTHORIZATION FOR DOCKET | 2019-03-28 |
GPA Docket 19-08 Petition to Exercisse Extension Option under the Diesel Fuel Suppy Contract with Mobil Oil Guam, Inc. and Isla Petroleum and Energy, LLC (IP&E Guam)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-03-28 | |
| PUC COUNSEL REPORT | 2019-03-25 |
GPA Docket 19-07 Petition for Adjustment of the Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-01-31 | |
| ALJ REPORT | 2019-01-29 |
GPA Docket 19-06 Investigation of Meters and Backbilling
GPA Docket 19-05 Investigation of Emergency Waterwell and Wastewater Charges
GPA Docket 19-04 Petition for Modification of Current Net Metering Rider
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-05-30 | |
| ALJ REPORT | 2019-05-24 | |
| GPA PETITION | 2018-10-05 |
GPA Docket 19-03 Petition for Approval of Property Insurance Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-10-25 |
GPA Docket 19-02 Application requesting Approval of the Procurement for a New ULSD Pipeline System
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-07-25 | |
| PUC ALJ REPORT | 2019-07-18 | |
| GPA PETITION | 2019-06-13 | |
| PUC ORDER | 2018-10-25 | |
| ALJ REPORT | 2018-10-18 | |
| EXHIBIT A | 2018-10-18 |
GPA Docket 19-01 Application requesting Approval of the Procurement for Buld Storage Fuel Tanks Inspection and Refurbishment
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2019-09-26 | |
| COUNSEL REPORT | 2019-09-26 | |
| PUC ORDER | 2018-10-25 | |
| ALJ REPORT | 2018-10-18 |
GPA Docket 18-18 Filing of the FY2019-2021 Construction Budget
| Title | Date | Download |
|---|---|---|
| CONTRUCTION BUDGET 2019-2021 | 2018-09-14 |
GPA Docket 18-17 Petition to Approve FY2019 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-09-24 | |
| PUC COUNSEL REPORT | 2018-09-24 |
GPA Docket 18-16 Application to approve a three-month extension to the contract for residual fuel oil No. 6 for the baseload power generating plants.
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-06-26 | |
| PUC COUNSEL REPORT | 2018-06-20 |
GPA Docket 18-15 Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-06-26 | |
| PUC COUNSEL REPORT | 2018-06-18 |
GPA Docket 18-14 Application for Approval to Purchase the Harmon Porperty for New Generation Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-05-31 | |
| COUNSEL REPORT | 2018-05-31 |
GPA Docket 18-13 Application to Approve the Piti 8 & 9 Contract Extension with Marianas Energy Company
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-05-31 | |
| PUC COUNSEL REPORT | 2018-05-21 |
GPA Docket 18-12 Insurance IFB
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-04-26 | |
| PUC COUNSEL REPORT | 2018-04-18 |
GPA Docket 18-11 Petition to Approve GPA’s Use of Bond Financing Savings for GPA’s “Bringing Energy Savings to Schools” (BESTS) and Demand Side Management Program
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-03-29 | |
| PUC COUNSEL REPORT | 2018-03-25 |
GPA Docket 18-10 Petition to Approve Contract Extension for Tristar Terminals Guam, Inc., for Dock, Pipeline, and Fuel Storage Facility
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-08-30 | |
| PUC COUNSEL REPORT | 2018-08-24 |
GPA Docket 18-09 Petition to Increase EPCM Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-11-29 | |
| ALJ REPORT | 2018-11-27 | |
| PUC ORDER | 2018-03-29 | |
| PUC COUNSEL REPORT | 2018-03-26 |
GPA Docket 18-08 Petition to Approve Phase II Renewable Award to HANWA ENERGY CORPORATION
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-03-29 | |
| PUC COUNSEL REPORT | 2018-03-23 |
GPA Docket 18-07 Petition to Approve Piti Substation GIS Maintenance Award to AYM International
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-02-22 | |
| PUC COUNSEL REPORT | 2018-02-19 |
GPA Docket 18-06 Petition to Approve Phase II Renewable Award to KEPCO-LG CNS Consortium
| Title | Date | Download |
|---|---|---|
| PUC ORDER OF RATIFICATION | 2018-03-29 | |
| PUC ORDER | 2018-02-22 | |
| PUC COUNSEL REPORT | 2018-02-16 |
GPA Docket 18-05 Petition for Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-01-30 | |
| PUC COUNSEL REPORT | 2018-01-29 |
GPA Docket 18-04 Application of GPA to Exercise Extension Option under the Diesel Fuel Supply Contract w/ Mobil Oil Guam & Isla Petroleum and Energy (IPE)
| Title | Date | Download |
|---|---|---|
| ORDER OF RATIFICATION | 2018-01-30 | |
| PUC ORDER | 2017-12-18 | |
| PUC COUNSEL REPORT | 2017-12-13 |
GPA Docket 18-02 The Application of GPA to Approved the Procurement for the 180MW Power Plant
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2018-08-30 | |
| PUC COUNSEL REPORT | 2018-08-25 | |
| PUC ORDER | 2017-11-30 | |
| PUC COUNSEL REPORT | 2017-11-25 |
GPA Docket 18-01 Petitionto Approve the Procurement of Residual Fuel Oil No. 6 for Baseload Power Generating Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-10-26 | |
| PUC COUNSEL REPORT | 2017-10-26 |
GPA Docket 17-24 Filing of FY2018-2020 Construction Budget
| Title | Date | Download |
|---|---|---|
| CONTRUCTION BUDGET 2018-2020 | 2017-09-13 |
GPA Docket 17-23 Petition to Approve the Contract w/Tristar Terminals Guam Inc. for the Lease of an Additional Storage Tank for Diesel Fuel
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-09-28 | |
| PUC COUNSEL REPORT | 2017-09-28 |
GPA Docket 17-22 Petition to Approve FY2018 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-09-28 | |
| PUC COUNSEL REPORT | 2017-09-28 |
GPA Docket 17-21 Petition for Approving the Procurement of Phase III Renewaable Acquistion
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-09-28 | |
| PUC COUNSEL REPORT | 2017-09-28 |
GPA Docket 17-20 The Application of GPA to Approve A Bond Inssuance to Refinance the Outstaning 2010 Series A Revenue Bonds
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-12-05 | |
| PUC ORDER LONG-TERM DEBT | 2017-12-05 | |
| PUC ALJ REPORT | 2017-11-30 |
GPA Docket 17-19 Levilized Energy Adjustment Clause "LEAC"
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-07-27 | |
| PUC COUNSEL REPORT | 2017-07-17 |
GPA Docket 17-18 The Application of the Guam Power Authority for Approving the Procurement for Spply of Diesel Fuel oil to GPA
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-09-28 | |
| PUC COUNSEL REPORT | 2017-09-28 | |
| PUC ORDER | 2017-02-23 | |
| PUC COUNSEL REPORT | 2017-02-13 |
GPA Docket 17-17 Levelized Energy Adjustment Clause LEAC
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-01-26 | |
| PUC COUNSEL REPORT | 2017-01-23 |
GPA Docket 17-16 Application of the Guam Power Authority Requesting Approval of the Performance Management Contract for the Management, Operation and Maintenance of Cabras 3 & 4 Power Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-02-23 | |
| PUC COUNSEL REPORT | 2017-02-17 | |
| PUC ORDER | 2016-12-29 | |
| PUC COUNSEL REPORT | 2016-12-16 |
GPA Docket 17-13 Petition for Cabras 4 Engine and Equipment Removal
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-11-28 | |
| PUC COUNSEL REPORT | 2016-11-23 |
GPA Docket 17-12 Petition to Approve Cabras 3 & 4 Plant and Engine Cleaning
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-11-28 | |
| PUC COUNSEL REPORT | 2016-11-22 |
GPA Docket 17-11 Petition for Approval of Additional Expenditures for Dededo CT Return to Service
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-11-28 | |
| PUC COUNSEL REPORT | 2016-11-21 |
GPA Docket 17-09 Petition for Approval of Temes PMC Contract Extension for Cabras 1 & 2
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-11-28 | |
| PUC COUNSEL REPORT | 2016-11-21 |
GPA Docket 17-08 Petition for Approval of Aggreko Temporary Power Lease Extension
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-11-28 | |
| ALJ REPORT | 2016-11-25 |
GPA Docket 17-07 Petition for Approval of Insurance Extension
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-24 |
GPA Docket 17-06 Petition for Approval of Renewables Study
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-22 |
GPA Docket 17-05 Application to Award Contract for Environmental Engineering and Technical Services to Leidos
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-07-27 | |
| PUC COUNSEL REPORT | 2017-07-24 | |
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-22 |
GPA Docket 17-04 Application Requesting Approval of Award for a Performance Management of the GPA Fuel Farm Bulk Storage
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-08-31 | |
| PUC COUNSEL REPORT | 2017-08-31 |
GPA Docket 17-03 Petition to Approve Diesel Overhaul
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-22 |
GPA Docket 17-02 Petition to Approve Cabras 1 Overhaul
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-22 |
GPA Docket 17-01 Petition to Approve SCADA Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-10-27 | |
| PUC COUNSEL REPORT | 2016-10-24 |
GPA Docket 16-14 Petition of the Guam Power Authority for Approval of Insurance Invition for Bid
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-09-29 | |
| COUNSEL REPORT | 2016-09-29 |
GPA Docket 16-13 Petition to Aprove FY2017 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-09-29 | |
| PUC COUNSEL REPORT | 2016-09-23 |
GPA Docket 16-11 Petition of the GPA for Approval of Macheche CT Repairs
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-07-28 | |
| PUC COUNSEL REPORT | 2016-07-27 |
GPA Docket 16-10 GPA Levelized Energy Adjustment Clause [LEAC]
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-07-28 | |
| PUC COUNSEL REPORT | 2016-07-22 |
GPA Docket 16-09
GPA Docket 16-08 Petition of GPA for Approval of Procurement to Continue Conversion and Installation of Energy Efficient LED Streetlights
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-05-26 | |
| PUC COUNSEL REPORT | 2016-05-20 |
GPA Docket 16-07 Petition for Approval of Yigo CT Repairs
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-04-28 | |
| PUC COUNSEL REPORT | 2016-04-27 |
GPA Docket 16-06 Petition for Approval of the Bond Fund Reallocation for Dededo CT PMC
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-04-28 | |
| PUC COUNSEL REPORT | 2016-04-27 |
GPA Docket 16-05 NAVY LEASE FOR 45MW SOLAR PROJECT
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-07-28 | |
| PUC COUNSEL REPORT | 2016-07-11 |
GPA Docket 16-04 Petition for Extension of TRC Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-04-28 | |
| PUC COUNSEL REPORT | 2016-04-23 |
GPA Docket 16-03 Petition of the Guam Power Authority for Approval of Insurance Adjuster Fees
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2016-03-31 | |
| PUC ORDER | 2016-03-31 |
GPA Docket 16-02 Petition for Ratification of Design/Construction Contract for the GPA Wind Turbine Pilot Project
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2016-03-31 | |
| PUC ORDER | 2016-03-31 |
GPA Docket 16-01
GPA Docket 15-27 LEAC Matter
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2016-01-25 | |
| SUPPLEMENTAL COUNSEL REPORT | 2016-01-25 | |
| PUC ORDER | 2016-01-25 |
GPA Docket 15-26
GPA Docket 15-25 Application of the GPA Requesting approval of the Performance Management Contract (PMC) for the Management,Operation and Maintenance of GPA Cabras 3&4 Power Plants
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2015-12-10 | |
| PUC ORDER | 2015-12-10 |
GPA Docket 15-24 Application of the GPA Requesting approval of the Performance Management Contact for the Mangement, Operation and Maintenance of Cabras 1&2 Power Plant
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2015-12-10 | |
| PUC ORDER | 2015-12-10 |
GPA Docket 15-23 Application of the Guam Power Authority to Approve the Procurement of Bucket Trucks
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2015-12-10 | |
| PUC ORDER | 2015-12-10 |
GPA Docket 15-22 Application to Approve the Porcurement of the Performance Mangement Contract (PMC) for Combustion Turbine Power Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-01-25 | |
| PUC ORDER | 2015-12-10 | |
| PUC REQUEST FOR INFORMATION | 2015-11-30 |
GPA Docket 15-21 Request of the Guam Power Authority to Authorize Expenditures for the Demolition of the Cabras No. 3&4 Roof
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2015-10-29 | |
| PUC ORDER | 2015-10-29 |
GPA Docket 15-20
GPA Docket 15-19 Petition to Approve FY2016 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2015-09-24 |
GPA Docket 15-18 Petition for Procurement of Temporary Power Services [Replacement for loss of Cabras 3 & 4]
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2015-10-29 | |
| PUC ORDER | 2015-10-29 | |
| COUNSEL REPORT | 2015-09-24 | |
| PUC ORDER | 2015-09-24 |
GPA Docket 15-17 Green Solution Complaint
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2016-07-28 | |
| PUC ORDER | 2016-03-31 | |
| PUC ORDER | 2016-01-25 |
GPA Docket 15-16 Petition for Approval of Procurement of the Energy Storage System
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2017-02-23 | |
| PUC COUNSEL REPORT | 2017-02-20 | |
| PUC ORDER | 2015-07-16 | |
| PUC COUNSEL REPORT | 2015-07-13 |
GPA Docket 15-15 LEAC Matter
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2015-07-16 |
GPA Docket 15-14 Approve the Diesel Engine Clylinder Lubricaton Oil Contract with Pacific Petroleum Trading Corporation (PPTC)
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2015-04-30 | |
| PUC ORDER | 2015-04-30 |
GPA Docket 15-13 Feed In Tariffs (FIT)
GPA Docket 15-12 Compressed Air Energy Storage (CAES)
| Title | Date | Download |
|---|---|---|
| COMPRESSED AIR ENERGY STORAGE REPORT | 2015-07-06 |
GPA Docket 15-11 Authority to Approve the Procurement of Performance Management Contract for Cabras Units 1&2 and 3&4
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2015-04-30 | |
| PUC ORDER | 2015-04-30 |
GPA Docket 15-10 Application of GPA to Approve the Contract Extension for Supply of Residual Fuel Oil No. 6 to GPA
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2015-03-26 | |
| COUNSEL REPORT | 2015-03-26 |
GPA Docket 15-09 Guam Renewal Energy Association Complaint
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2015-02-26 | |
| LUMMUS REPORT | 2015-02-26 | |
| ALJ REPORT | 2015-02-24 |
GPA Docket 15-08 Levelized Energy Adjustment Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2015-01-29 |
GPA Docket 15-06 Petition for Approval of Settlement with Pruvient Energy Guam Investment Inc. to terminate the Energy Conversion Agreement
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-12-29 | |
| PUC ORDER | 2014-12-29 |
GPA Docket 15-05 New Generation Combined Cycle Units and to proceed with Implementation of the IRP
GPA Docket 15-04 Petition for approval of financing for the Insurance Contract with AM Insurance
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-12-01 | |
| PUC ORDER | 2014-12-01 |
GPA Docket 15-02 Authority to approve the FY2015 GPA CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-12-01 |
GPA Docket 14-14 - Contract with East West Power Guam for Cabras 4 Generator Overhaul
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-06-26 | |
| COUNSEL REPORT | 2014-06-24 |
GPA Docket 14-13 Draw from Self Insurance Fund for Cabras 3 Rotor Repair
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-07-31 | |
| PUC ORDER | 2014-07-31 |
GPA Docket 14-12 LEAC Adjustment
| Title | Date | Download |
|---|---|---|
| PUC RATIFICATION ORDER | 2014-12-01 | |
| SLATER REPORT | 2014-07-31 | |
| PUC ORDER | 2014-07-31 |
GPA Docket 14-11 - Procurement of Phase II Renewable Acquisition
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-06-26 | |
| COUNSEL REPORT | 2014-06-20 |
GPA Docket 14-10 Solar PV for Guam Community College
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-08-28 | |
| PUC ORDER | 2014-08-28 | |
| ALJ REPORT | 2014-08-26 |
GPA Docket 14-09, Guam Power Authority Request for PUC Approval of Issuance of 2014 Revenue Bonds
GPA Docket 14-08 - Procurement for Cylinder Lubricating Oil
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-05-29 | |
| COUNSEL REPORT | 2014-05-13 |
GPA Docket 14-07 – Contract for Cabras 3&4 Smoke Stack Refurbishment
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-03-31 | |
| PUC ORDER | 2014-03-31 |
GPA Docket 14-06 - Fuel Letter of Credit Facility
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-02-25 | |
| COUNSEL REPORT | 2014-02-20 |
GPA Docket 14-05 - Procurement for Supply of Diesel Fuel
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-12-01 | |
| PUC ORDER | 2014-12-01 | |
| PUC ORDER | 2014-02-25 | |
| COUNSEL REPORT | 2014-02-18 |
GPA Docket 14-04 - Draw from Self-Insurance Fund for Cabras 3 Roto Repair Costs
| Title | Date | Download |
|---|---|---|
| COUNSEL REPORT | 2014-01-30 | |
| PUC ORDER | 2014-01-30 |
GPA Docket 14-03 - LEAC
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2014-01-30 | |
| SLATER REPORT | 2014-01-28 |
GPA Docket 14-02 - PMO Contract with R.W. Armstrong
GPA Docket 14-01 - Implementation of its Custormer Information System [CIS]
GPA Docket 13-16 - FY 2014 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-10-29 |
GPA Docket 13-15 - FY2014 Construction Budget
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-10-29 | |
| LUMMUS REPORT | 2013-10-21 |
GPA Docket 13-14 - Demand Side Management
GPA Docket 13-13 Reliability of GPA Power System
GPA Docket 13-12 Smart Grid Opt Out Policy
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-08-27 | |
| LUMMUS REPORT | 2013-08-22 |
GPA Docket 13-11 Tristar Fuel Storage-Dock Facility Agreement
| Title | Date | Download |
|---|---|---|
| PUC SUPPLEMENTAL ORDER | 2013-09-24 | |
| LUMMUS FUEL STORAGE REPORT | 2013-09-20 | |
| PUC COUNSEL REPORT | 2013-08-22 | |
| PUC ORDER | 2013-07-30 | |
| PUC COUNSEL REPORT | 2013-07-24 |
GPA Docket 13-10 RFO Fuel Award Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-07-30 | |
| PUC COUNSEL REPORT | 2013-07-19 |
GPA Docket 13-09 - Regulation of Electric Service Providers
GPA Docket 13-08 - Revenue Decoupling
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2014-08-28 | |
| PUC ORDER | 2014-08-28 |
GPA Docket 13-07 - Commercial Paper Program
GPA Docket 13-06 - LEAC
| Title | Date | Download |
|---|---|---|
| LEAC EXHIBITS | 2013-07-30 | |
| PUC ORDER | 2013-07-30 | |
| PUC CHAIRMAN'S REPORT | 2013-07-16 |
GPA Docket 13-05 - Procurement of Equipment of Diesel RICE MACT Compliance and Environmental Compliance for Diesel Units
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-10-29 | |
| PUC COUNSEL REPORT | 2013-10-28 | |
| PUC ORDER | 2013-05-28 | |
| COUNSEL REPORT | 2013-05-24 |
GPA Docket 13-04 - The Petition of the Guam Power Authority for Approval of Insurance Invitation for Bid
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-10-29 | |
| PUC COUNSEL REPORT | 2013-10-28 | |
| PUC ORDER | 2013-05-28 | |
| COUNSEL REPORT | 2013-05-24 |
GPA Docket 13-03 - Overhaul and Capital Projects
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-04-30 | |
| COUNSEL REPORT | 2013-04-29 |
GPA Docket 13-02 - GPA Integrated Resource Plan
GPA Docket 13-01 - Cabras 3 Rotor Repair
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-01-29 | |
| PUC COUNSEL REPORT | 2013-01-26 |
GPA Docket 12-13 - LEAC Filing
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-01-29 | |
| GCG REPORT ON THE LEAC FINAL | 2013-01-23 | |
| LEAC FILING | 2012-12-17 |
GPA Docket 12-12 - Engineering Technical Services Contract with R.W. Beck
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-11-20 | |
| PUC COUNSEL REPORT | 2012-11-14 |
GPA Docket 12-11 - FY2013 CIP Ceiling Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-10-30 | |
| SHAW REPORT ON GPA FY13 CIP CEILING CAP | 2012-10-24 |
GPA Docket 12-10 - FY2013 Construction Budget
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-10-30 | |
| GPA FY13 CONSTRUCTION BUDGET | 2012-10-24 |
GPA Docket 12-09 - Procurement of Residual Fuel Oil No. 6 for Baseload Plants
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2013-02-26 | |
| PUC ORDER | 2013-02-08 | |
| PUC COUNSEL REPORT | 2013-02-08 | |
| PETITION FOR CONTRACT REVIEW | 2013-02-04 | |
| PUC ORDER | 2012-07-30 | |
| PUC COUNSEL REPORT | 2012-07-25 |
GPA Docket 12-08 - Utility Services Contract with U.S. Navy
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-07-30 | |
| PUC COUNSEL REPORT | 2012-07-25 | |
| GPA CSA USC PRESENTATION SUMMARY (7-10-2012) | 2012-07-10 |
GPA Docket 12-07 - Distributed Control Conversion
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-07-30 | |
| PUC COUNSEL REPORT | 2012-07-10 |
GPA Docket 12-06 - Levelized Energy Adjustment Clause
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-07-30 | |
| GCG'S REPORT RE: GPA DOCKET 12-06 REQUEST FOR LEAC FACTORS EFFECTIVE AUGUST 1, 2012 | 2012-07-23 |
GPA Docket 12-05 - Extension of Diesel Fuel Oil Supply Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-07-30 | |
| PUC COUNSEL REPORT | 2012-07-10 |
GPA Docket 12-04 - Extension of Diesel Engine Cylinder Lubrication Oil Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-07-30 | |
| PUC COUNSEL REPORT | 2012-07-10 |
GPA Docket 12-03 - Bond Refinance
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-09-25 | |
| SHAW CONSLTS INTL FINAL REPORT RESTRUCTURING/REFINANCING | 2012-09-18 | |
| GCG REPORT | 2012-09-16 |
GPA Docket 12-02 - Buyout of Lehman Brothers Investment Contract
| Title | Date | Download |
|---|---|---|
| PUC ORDER | ||
| RESPONSE OF GCG TO GPA'S PETITION TO APPROVE BUY-OUT OF FORWARD DELIVERY AGREEMENT WITH LEHMAN BROTHERS RE: GPA DOCKET |
GPA Docket 12-01 - Regulatory Services Contract with R.W. Beck
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-03-26 | |
| PUC COUNSEL REPORT | 2012-03-19 |
GPA Docket 11-17 - Software Systems Implementation Plan
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-02-06 | |
| LETTER TO CHAIR RE: SOFTWARE IMPLEMENTATION | 2012-01-24 |
GPA Docket 11-16 - Levelized Energy Adjustment Clause
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-02-06 | |
| GCG REVISED REPORT | 2012-01-23 | |
| ERRATA MEMO | 2012-01-21 |
GPA Docket 11-15 - Repair of Dededo Combustion Turbine Generators
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2012-01-11 | |
| PUC COUNSEL REPORT | 2011-12-15 |
GPA Docket 11-14 - New GPA Office Project
| Title | Date | Download |
|---|---|---|
| PUC ORDER | ||
| PUC COUNSEL REPORT | 2011-12-14 |
GPA Docket 11-13 - Smart Grid
GPA Docket 11-12 - Renewable Energy Procurement
GPA Docket 11-11 - FY2012 Construction Budget
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-11-07 | |
| GCG'S REPORT | 2011-11-01 |
GPA Docket 11-10- FY2012 CIP Budget Cap
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-11-07 | |
| GCG'S RESPONSE | 2011-10-27 |
GPA Docket 11-09 - BASE RATE FILING
GPA Docket 11-08 - Payment in Lieu of Taxes
| Title | Date | Download |
|---|---|---|
| DEFERRAL ORDER | 2011-08-10 | |
| PUC COUNSEL REPORT | 2011-08-08 |
GPA Docket 11-07 - Fuel Contract Ammendment
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-08-10 | |
| PUC COUNSEL REPORT | 2011-07-05 |
GPA Docket 11-06 - Levelized Energy Adjustment Clause
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-07-25 | |
| GCG'S RESPONSE | 2011-07-14 |
GPA Docket 11-05 - GPA Property Insurance Renewal
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-06-20 | |
| PUC COUNSEL REPORT | 2011-06-14 |
GPA Docket 11-04 - Self-Insurance Policy
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-05-16 | |
| PUC COUNSEL REPORT | 2011-05-11 |
GPA Docket 11-03 - GPA Request of the Procurement for Guaranteed Investment Contracts
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-02-21 |
GPA Docket 11-02 - GPA Intergrated Program Management Office [PMO]
GPA Docket 11-01 - GPA Request for Approval re: Construction of the Marbo to Pagat 34.5 v K
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-02-21 | |
| PUC COUNSEL REPORT | 2011-02-14 |
GPA Docket 10-11 - GPA Levelized Energy Clause (LEAC)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-01-31 | |
| LEAC FILING | 2010-12-15 |
GPA Docket 10-10 Petition to Extend Dock Facility and STorage Agreement with Tristar
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2010-12-15 | |
| PUC COUNSEL REPORT | 2010-12-13 |
GPA Docket 10-09 Procurement of Environmental & Technical Services
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-06-20 | |
| PUC COUNSEL REPORT | 2011-06-06 |
GPA Docket 10-08 - Review Invitation for Bids for GPA Fuel Bulk Storage Facility
| Title | Date | Download |
|---|---|---|
| PUC COUNSEL REPORT | 2015-04-30 | |
| PUC ORDER | 2015-04-30 | |
| PUC ORDER | 2010-11-29 |
GPA Docket 10-07 Small Nuclear Power Reactors
GPA Docket 10-06 Construction Budget (New Bond Funder CIPs-Existing Bond Funded Projects)
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2010-10-29 |
GPA Docket 10-05 FY2011 CIP Budget Cap (Contract Review)
GPA Docket 10-04 - GPA Approval of PMC Cabras 1 & 2
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2011-12-15 | |
| PUC COUNSEL REPORT | 2010-09-13 |
GPA Docket 10-03 - Fuel Hedging
| Title | Date | Download |
|---|---|---|
| GPA STATUS REPORT | 2013-06-13 | |
| PUC ORDER | 2012-03-26 | |
| GCG REPORT | 2012-03-21 |
GPA Docket 10-02- Navy LEAC Issues
| Title | Date | Download |
|---|---|---|
| PUC ORDER | 2010-07-22 | |
| ALJ ORDER | 2010-07-12 |
GPA Docket 10-01 - GPA Contract Review Approval of 2010 Bonds Financed Projects
GPA Docket No. 08-10 Net Metering
| Title | Date | Download |
|---|---|---|
| ORDER | 2008-12-29 |
GPA Docket 02-04 - GPA Levelized Energy Clause (LEAC)